St John Vianney
Trafford
Number of Students:
160Project Value:
£645KMonths on site:
24Project Overview
The DfE-led replacement of St John Vianney School in Trafford created a new building for 160 SEND pupils aged five to 19, welcoming secondary pupils for the first time.
Main contractor Kier appointed Pinnacle to provide design consultancy, which went on to become a full supply, manufacture and installation order.
The site also includes a pavilion-style building with a sports hall and hydrotherapy pool. The school was designed to be net zero carbon in operation, using solar PV and air source heat pumps.
The larger intake allowed the school to add vocational subjects, including hair and beauty, and the project delivered a significant package of specialist therapy provision to meet local need.
The Brief
We designed and delivered the full FF&E suite, including:
- Specialist SEND therapy facilities, including a hydrotherapy pool, a rebound room and a sensory immersion room
- Supporting SEND therapy suites
- Vocational teaching spaces for hair and beauty
- A chapel reflecting the school’s link with the local Catholic church
- Audio-visual systems in the hall, the chapel and the hydrotherapy pool, including sound and lighting
What We Did
We designed spaces where pupils can learn, build confidence and develop independence.
The immersive room
Picture a busy Manchester tram station: the crowds, the noise, the smells, the rush of air as a tram pulls in. In the immersive room, pupils can experience it all in a safe, controlled space.
The room offers a 4D experience that combines projection, sound, smoke, wind and aroma. Staff start with the visuals, then layer in each sensory element step by step. When a child meets that environment in real life for the first time, they are better prepared and less likely to feel overwhelmed. It helps pupils build the ability to cope with high-energy, high-noise settings.
Specialist provision
We detailed every specialist area, working closely with Kier to coordinate each package. The hydrotherapy pool has sound and lighting designed for therapeutic use.
The chapel
The school’s chapel reflects its Catholic links and features a double-height window dressed to emulate stained glass. We designed an audio-visual system that works with the space and supports worship and school gatherings without competing with the architecture.
Furnishing the spaces
We furnished every space around how pupils learn. Primary classrooms have flexible seating for small groups, including Postura chairs and beanbags, plus built-in sinks and storage so everything is close to hand. The DT workshop and art room are fitted for practical, hands-on work, while the medical treatment room, library and café give pupils calmer places to be. The dining hall, ICT room, hall and offices complete the school.
Phased delivery
The new school was built alongside the existing facility, which kept disruption to pupils and staff to a minimum. Once it was complete, the school’s operations transferred to the new building and the original structures were demolished. Within that programme, Pinnacle delivered the project in two phases: the main school building first, then the hall and hydrotherapy pool building.
The Result
The finished school brings specialist learning, therapy and wellbeing spaces together. It also gives the school room to grow, with a wider curriculum and a larger community.
Operations Manager Chris Gregory at Kier Construction praised our work and the contribution of our Project Manager Jodie Lindley. Watch the video of Chris sharing his experience of working with Pinnacle.
*Photography courtesy of Kier Group